Projects Under Construction

Planned for the Wright Business Park, the battery storage facility will be constructed on an acre of land next to the existing Festival Hydro transformer station. Using Powin...
The Saturn Power Corp Tumble weed project is a 9.9 megawatt photovoltaic project. This project is located between Bend and Redmond Or. along Hwy 97. The project site is a 95 acre...
The Chiloquin Project is a 9.9 megawatt photovoltaic power generation facility on a single 118 acre parcel. The project will cover approximately 73 acres of the parcel, with the...
Capacity: 4.8MW DC Completed: June 2017
Capacity: 3 MW AC project in Turkey
Capacity: 2 MW AC project in Turkey
Capacity: 500 kW project in Blind River
Capacity: 500 kW project in Blind River
Capacity: 500 kW project in Blind River
Capacity: 500 kW project in Blind River
Capacity: 500 kW project in Blind River