Solar Projects

Name Plate Capacity : 10 MW AC Commercial Operation : February 2015 Saturn Power owned & operated facility. As the developer, Saturn was responsible for land agreements,...
Name Plate Capacity : 10MW AC Commercial Operation : Fall 2012 Through a joint venture with Canadian Solar, Saturn Power developed the project to completion with a final sale to...
Name Plate Capacity: 10 MW AC Commercial Operation: Spring 2012 Having secured a contract for this solar farm, Saturn navigated utility interconnection and permitting requirements...
The Chiloquin Project is a 9.9 megawatt photovoltaic power generation facility on a single 118 acre parcel. The project will cover approximately 73 acres of the parcel, with the...
The Saturn Power Corp Tumble weed project is a 9.9 megawatt photovoltaic project. This project is located between Bend and Redmond Or. along Hwy 97. The project site is a 95 acre...
Capacity: 4.8MW AC Completed: June 2017
Capacity: 3MW AC Completed: January, 2018 The Nigde project is located within a 10 MW solar farm. Saturn Power was responsible for the permitting, engineering and the construction...
Capacity: 2MW AC Completed: January 2018 This project is located within an hour from Denizli city center. Saturn Power took over the project and completed the TEDAS and zoning...
Capacity: 500 kW project in Blind River Commercial Operation: June 6, 2017 As the developer, Saturn was responsible for land agreements, permits, engineering and construction of...
Capacity: 500 kW project in Blind River
Capacity: 500 kW project in Blind River
Name Plate Capacity: 480 kW AC Commercial Operation: Feb 5, 2016 Saturn Power owned and operated tracking facility. As the developer, Saturn was responsible for land agreements,...
Name Plate Capacity: 400 kW AC Completed: August 2016 Saturn Power owned & operated roof-top facility. As the developer, Saturn was responsible for permitting, engineering...
Name Plate Capacity: 240 kW AC Commercial Operation: November 2015 Saturn Power owned & operated roof-top facility. As the developer, Saturn was responsible for permitting,...